Investment incentive
- Building materials (Precast concrete, Bricks, Roofing, etc.);
- Footwear; Textile (no dyeing);
- Mechanical engineering; Electronic products;
- Wood products; Interior decoration; Packing.
AGTEX Long Binh Industrial Park
-
Infrastructure
*Transportation: internal roads & drainages are under construction.
*Power supply: from the national grid.
*Water supply: meet all the demand.
* Telecommunications: convenient for domestic and international links.
*Wastewater treatment: The Waste Water Treatment Plant with current capacity of 300 m3/day.