Investment incentive

- Building materials (Precast concrete, Bricks, Roofing, etc.);

- Footwear; Textile (no dyeing);

- Mechanical engineering; Electronic products;

- Wood products; Interior decoration; Packing.

9B3D286A AC79 45B1 AC1E 7E8F95F9D4BD

AGTEX Long Binh Industrial Park

-

Infrastructure

*Transportation: internal roads & drainages are under construction.

*Power supply: from the national grid.

*Water supply: meet all the demand.

* Telecommunications: convenient for domestic and international links.

*Wastewater treatment: The Waste Water Treatment Plant with current capacity of 300 m3/day.

61543CB3 9113 4E45 8230 31F1C251F1AF